Dmitrijs Taranenko · Lead .NET / Cloud Architect

Make complex .NET systems faster, safer and easier to change.

I help CTOs and engineering leaders modernize distributed platforms, eliminate production bottlenecks and regain control of delivery.

15+ years · AWS and enterprise SaaS · Spain / EU-based · Selected independent B2B engagements

90–200 ms

selected queries, reduced from 2–4 seconds

~50%

faster deployment, from about 60 to 30 minutes

+35%

online conversion after a redesigned purchasing flow

~$40k

annual saving after replacing a third-party LMS

Profile

Hands-on architecture for difficult systems

I am a software architect and principal-level engineer with 15+ years of experience building enterprise SaaS across FinTech, EdTech, healthcare and manufacturing. I work where architecture, production reliability and implementation depth all matter.

Dmitrijs Taranenko

Lead Developer, Cloud Engineer & Independent Consultant

I work as a Lead Developer / Cloud Engineer at Entrypoint while building an independent consulting and product practice through selected B2B engagements. I combine architecture ownership with hands-on delivery: tracing real code and data paths, resolving production problems, implementing targeted changes and proving them through builds, tests and operational evidence.

Systems: distributed .NET platforms, microservices, databases, integrations and cloud infrastructure.

Problems: scalability, performance, concurrency, data consistency, reliability and modernization.

Availability: one selected independent engagement at a time, with scope and delivery capacity agreed around the problem.

Based in Spain and available across Europe and internationally.

How I can help

Senior engineering ownership where it matters most

Available for focused assessments, technical investigations, implementation sprints and fractional leadership across Europe and internationally.

Architecture & modernization

Clarify system boundaries, reduce technical risk and evolve complex .NET and cloud platforms without losing delivery momentum.

Production troubleshooting

Investigate performance, concurrency, data consistency, integration and reliability problems across application and infrastructure layers.

Fractional technical leadership

Provide architecture ownership, design and code review, mentoring, delivery guidance and difficult hands-on implementation.

AI-augmented engineering

Integrate coding agents into real delivery workflows with research discipline, repository conventions, testing and human verification gates.

Ways to work together

Four focused ways to move a difficult system forward

I currently accept one selected independent engagement at a time. Scope, delivery window and reserved capacity are agreed around the problem, urgency and expected outcome.

* Typical ranges for a focused scope. Final effort and delivery window depend on system size, complexity, access and critical flows, and are confirmed before work begins. Calendar windows allow for access, feedback and verification; any scope beyond the agreement is discussed before work continues.

AI-augmented engineering

AI is the multiplier. Engineering judgment remains the control plane.

I use coding agents as a structured engineering channel for research, planning, implementation, testing and review—not as a substitute for architecture ownership or production discipline.

01

Research before edits

Trace real call and data paths across repositories, identify the smallest safe change surface, then implement.

02

Root cause over symptoms

Use cross-layer investigation and tests to expose transaction, data-integrity and concurrency defects.

03

Verification as a gate

Drive builds and large automated suites to green, including repeated runs exceeding 500 tests.

04

Controlled agentic delivery

Stop wrong assumptions, reject scope creep and keep human approval at architecture and risk boundaries.

ResearchPlanImplementVerifyReview

Vibe-coded project getting harder to change?

I analyse, repair and clean up AI-generated code.

I bring fast-built web, .NET, backend and cloud projects under engineering control: fix fragile behaviour, remove duplicated and contradictory code, restore clear structure and add meaningful tests.

01 Reproduce, trace and prioritize 02 Initial cleanup: 20–30 focused hours* · typical delivery window: 2–4 weeks
* Final scope is confirmed after repository discovery.
Explore cleanup & production readiness
Download the engineering evidence

Selected case studies

Architecture ownership translated into measurable outcomes

Two examples of hands-on architecture and implementation across enterprise FinTech and EdTech systems.

Enterprise FinTech engagement

Distributed commercial real-estate platform

90–200 msselected queries, from 2–4s
~50%faster deployment
~10%lower AWS cost

Context

An AWS-based portfolio-management platform spanning 40+ microservices and supporting 120,000+ loans and 40,000+ commercial real-estate transactions.

My ownership

Over 18 months, I worked across UI and backend delivery. I built the complete Rolodex module for managing clients, accounts and access to content, and separately developed a module for managing commercial real-estate portfolios. I also repaired financial metric calculators, implemented and corrected user interfaces, and contributed to system design.

Engineering decisions

Designed controllers, APIs, system modules and concurrent processing. Combined serverless architecture, Redis caching, database optimization and infrastructure right-sizing across performance-sensitive flows.

Enterprise EdTech engagement

Enterprise learning and content platform

+35%online conversion
~$40kannual saving
10kdaily logins

Context

A legacy platform needed a modern architecture capable of supporting 70,000+ users and approximately 10,000 daily logins.

My ownership

I led system design and worked hands-on with one other developer across a custom LMS, real-time collaborative editing of shared SVG content, user and content administration, a content gallery, and a redesigned purchasing experience.

Engineering decisions

Designed the replacement platform and buying flow, introduced scalable real-time collaboration, established secure-development practices, and prepared the system for annual SOC 2 audits and penetration testing.

Client-side recommendation

Trusted as an embedded engineering partner

“I've had the pleasure of working with Dmitri on numerous projects, and I can confidently attest to his exceptional skillset and dedication to delivering high-quality solutions. His strong communication skills and collaborative mindset make him an invaluable asset to any team.”

Abdullah Elgendy Senior Software Engineer & Team Lead · Thinking Maps, Inc. Worked together while Abdullah led the client engineering team and I joined it as an external senior engineer. View profile on LinkedIn

Free architecture resource

Architecture Assessment Checklist for Complex .NET Systems

A practical 10-point framework for identifying architecture risk, production bottlenecks and the safest modernization sequence before committing to a rewrite or major migration.

15-minute review 10 assessment areas Simple risk score
Open the checklist

Technical depth

Built around backend and cloud systems

A broad delivery toolkit anchored in C#/.NET, AWS, distributed systems and production engineering.

Architecture & backend

C# · .NET · ASP.NET Core · Web API · Distributed Systems · Microservices · REST · gRPC · Entity Framework · Dapper · SignalR

Cloud & infrastructure

AWS · Azure · Kubernetes · Docker · Helm · Serverless Architecture · CI/CD · Lambda · SQS · Cognito · IAM · S3

Data & reliability

PostgreSQL · SQL Server · MySQL · DynamoDB · MongoDB · Redis · Performance · Scalability · Concurrency · Data Consistency

Delivery & observability

GitHub Actions · Azure DevOps · Harness · Datadog · Splunk · Git · SOC 2 · Secure Coding · Production Troubleshooting

Supporting credentials

Education & certifications

Bachelor of Computer Science

Daugavpils University · 2010–2014

Microsoft Certified Professional

Microsoft

IBM Cybersecurity Analyst

IBM

Google Project Management

Google

Meta Front-End Developer

Meta

Frequently asked questions

Working with a Lead .NET & Cloud Architect

Direct answers about fit, engagement models, delivery approach and location.

What problems do you help engineering teams solve?

I help teams assess and modernize complex .NET systems, resolve production performance and reliability problems, improve distributed architectures and provide senior technical ownership where architecture and hands-on delivery must stay connected.

What is the best way to start?

For an unfamiliar or aging system, an Architecture & Codebase Assessment is usually the clearest first step. For an active incident or persistent production issue, start with a focused Performance & Reliability Investigation.

Do you offer ongoing technical leadership?

Yes. I work as a fractional architect or principal engineer for teams needing ongoing architecture decisions, design and code review, mentoring, delivery guidance and difficult hands-on implementation.

How do you use AI in software delivery?

I use coding agents for structured research, planning, implementation, testing and review. Architecture ownership, risk decisions and production verification remain human-controlled, with evidence and tests used as delivery gates.

Where are you based, and do you work remotely?

I am based in Spain and work remotely with clients across Europe and internationally. I accept one selected independent engagement at a time across assessments, investigations, implementation sprints and fractional leadership.

How is pricing determined?

Pricing follows an initial discovery conversation and depends on scope, urgency, technical risk and the most suitable commercial model. Assessments, focused investigations, monthly allocations and implementation sprints have different shapes.

Start a conversation

Bring me the engineering problem that needs senior ownership

Share the system, constraint or delivery challenge. I currently accept one selected independent engagement at a time.

Location

Spain · Europe · International remote

Available across time zones
Remote-first collaboration with clear written decisions, structured delivery and direct technical ownership.

Loading
Your message has been sent. I usually reply within one business day. If the problem is a fit, we’ll arrange a short technical conversation.